Latch - IBM 1402 Reference Manual

Card read-punch
Hide thumbs Also See for 1402:
Table of Contents

Advertisement

8. Recheck adjustments after several rotations of
punch unit camshaft. Setup bail height must be
gaged as closely as possible to drive unit side
frame. Side frames must be in contact with sur-
face on which gage is resting. Careful adherence
to these precautions and to the procedure out-
lined will result in bail parallelism within .003".
REMOVAL
1.
Remove punch unit from machine. Refer to Fig-
ure 3-32 when performing Steps 2 through 8.
2. Remove cam follower assembly from drive
unit.
3. Loosen set screws in collars on interposer setup
bail pivot shaft, and on interposer setup bail.
4. Remove interposer setup bail pivot shaft.
5. Remove interposer setup bail pivot stud at col-
umn-one end.
6. Remove interposer setup bail.
7. Assemble in reverse
order.
8. Check interposer setup bail adjustments.
ECCENTRI C
PUNCH UNIT CAMSHAFT
PUNCH BAIL
BAIL/
SETUP
Latch
REMOVAL
1.
Remove punch unit from machine.
2. Remove magnet unit from punch
unit.
See Figure
3-35.
3. Remove magnet bar assemblies from magnet unit.
See Figure 3-35.
4. Remove latch spring from latch. See Figure 3-34.
5. Push down on latch and unhook interposer link.
See Figure 3-34.
6. Remove latch from magnet side of unit. It may be
necessary to move latches next to the one being
removed, in order to obtain sufficient room for
removal. See Figure 3-36.
7. Assemble in reverse order.
a. Replace magnet unit on punch unit before
replacing magnet bar assemblies.
b. Pull latches down to the lowest limit of travel
by rotating the camshaft. This facilitates the
installation of the magnet bar assemblies.
c. Position magnet bar against top of slot in
magnet unit side frame.
r
GAGE 600914/'
'
Figure 3-33.
Drive Unit
3-28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents