IBM 1402 Reference Manual page 22

Card read-punch
Hide thumbs Also See for 1402:
Table of Contents

Advertisement

a scribed line. The casting has two scribed lines
which will coincide with collar lines at
on
punch index (see Figure 3-17)
.
4. Align shaft lines with scribe lines on casting, and
set punch index on
0°.
5. Slip the PACB belt over the punch pulley. If care
is taken, the PACB unit can be tightened and
both units will be in
time.
Refer to Timing Belt
Adjustments.
6.
If the PACB's are not in time, loosen PACB drive
pulley
screws.
a.
Align two scribed marks on PACB mounting
unit with collar scribed lines.
b. Set punch index to
0°,
and depress geneva pin.
c. Tighten pulley screws.
SECOND
STEPPED FEED ROLL DRIVE BELT REPLACEMENT
1. Loosen idler pulley. Install new belt and tighten
with idler pulley. Refer to Timing Belt Adjust-
ments.
2. For timing second stepped feed roll, refer to Feed
Rolls and Aligner Stations, Adjustments, Second
Stepped Feed Rolls, Steps 2 thru 7.
PLCB
DRIVE BELT REPLACEMENT
1. Install belt.
2. Retime PLCB to timer by loosening PLCB shaft
pulley
clamp~ng scr~ws.
TIMING
MARKS
' .
Figure
3-17.
PACB Timing Marks
PUNCH
UNIT
DRIVE BELT REPLACEMENT
Do not remove geneva unit when punch unit drive
belt is being replaced.
1. Loosen idler pulley. Install belt and tighten belt
with idler pulley.
2. Retime punch by loosening locking screws on
punch unit drive pulley.
a.
Set punch and timer index to
0°.
b. Depress geneva pin and tighten pulley lock
screws.
FIRST STEPPED FEED ROLL DRIVE BELT REPLACEMENT
1. Crank machine to
315'
(until
geneva pin de-
tents) .
2. Mark relationship of input idler pulley to punch
drive gear.
3. Mark relationships of main drive belt to input
idler pulley, geneva and main input pulley. Refer
to Figure 3-18.
4. Loosen first stepped .feed roll idler.
5. Remove
locating. pins.
in punch clutch magnet
f\'
'
bracket
assembly.
';'
NOTE:
Lower left pin is removed with puller;
upper right pin is removed (from rear of ma-
chine) with a punch.
6. Remove lower mounting screw; loosen upper
mounting screw. Punch clutch will now pivot
down for belt removal clearance.
7. Install first stepped feed roll belt; adjust tension.
Refer to Timing Belt
Adjustments.
8. Install clutch mounting
screws,
but do not tighten.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents