ACV E-tech W 09 Installation, Operating And Servicing Instructions page 3

Hide thumbs Also See for E-tech W 09:
Table of Contents

Advertisement

Who Should ReAd theSe InStRuctIonS
These instructions should be read by:
- the specifying engineer
- the installer
- the user
- the service engineer
SymbolS
Essential instruction for the correct
operation
of the installation.
Essential instruction for the safety of
persons
and the environment.
Danger of electrocution.
RecommendAtIonS
• These instructions are an integral part of the equipment
to which they refer and the user must be provided with a
copy.
• The product must be installed and serviced by qualified
engineers, in compliance with current standards.
• The manufacturer cannot accept liability for any damage
resulting from incorrect installation or from the use of
components or fittings not specified by the manufacturer.
• Any failure to follow instructions relating to tests and
test procedures may result in personal injury or risks of
pollution.
• It is important to switch the boiler off before carrying out
any work.
• There are no user parts inside the control panel.
ApplIcAble StAndARdS
The Boilers have been manufactured to comply with
the following standards BS EN60335-2-35: 2002,
BS EN55014-1: 2001 and BS EN55014-2:1997.
The installation must be in accordance with the
current standards.
664Y4700 • D
WARNINGS
ImpoRtAntS noteS
These instructions are an integral part of the equipment to
which they relate and must be handed to the user.
The product must be installed and serviced by qualified
engineers in accordance with the regulations in force.
The manufacturer declines all liability for any damage caused
as a result of incorrect installation or in the event of the use
of appliances or accessories that are not specified by the
manufacturer.
The manufacturer reserves the right to change the
technical characteristics and specification of its
products without notice.
The availability of certain versions and their accessoiries can
vary following the market.
Warning : Do not switch ON if there is a possibility
that the water in heater is frozen.
mAnuAl hAndlInG InStRuctIonS
RISK OF INJURY
LIFT WITH CARE
HEAVY
APPLIANCE
GET HELP
RemovInG the boIleR FRom the pAcKAGInG
• Before lifting the boiler from the packaging, ensure that the
installation area is clear and that there are no obstacles
making installation difficult or unsafe.
• Lay the boiler on its back (as shown on the box side), open
the box and remove the cardboard packaging.
• Remove the polythene cover and the polystyrene corner
protection pieces.
• With help from another person, lift the boiler from the
packaging holding the lipped front edges of the side panels.
• Do not lift or carry the boiler using the top automatic air vent
and bottom pump.
EN • 3
The weight of this boiler is 36Kg, which
could present a risk of injury.
Care should be taken when loading and
unloading the boiler to and from vehicles.
We recommend that the boiler be handled
by two people until it is securely fixed to
a wall.
The safest route from the vehicle to the
point of installation should be carefully
assessed before unloading the boiler.
Mechanical lifting aids should be
utilised whenever possible.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-tech w 15E-tech w 22E-tech w 28E-tech w 36

Table of Contents