Figure 25. Depth Skid Pivot & Shroud Pivot Pin
Figure 26. Pivot Frame Slider Tubes
NOTICE
The gearbox lubricant should initially be
replaced after 50 hours of operation. Subsequently
the lubricant should be replaced at 1000-hour inter-
vals or yearly, whichever occurs first.
1. Disconnect all hydraulic quick couplers from the
skid steer, relieve any residual back pressure in the
hoses and remove the motor from the gearbox by
removing two bolts as shown as shown in Figure
27.
Figure 27. Motor
20 Service
2. Raise the pavement saw so the cutting wheel is
free to rotate and turn the cutting wheel manually
until the drain plug of the gearbox is at the 6 o'clock
(lowest) position as shown in Figure 28. Remove
the plug and drain the lubricant from the gearbox.
3. To refill the gearbox rotate the cutting wheel so the
drain hole in at the 12 o'clock (highest) position as
shown in Figure 29.
Figure 28. Gearbox
4. Fill the gearbox with a funnel using 80-90W gear oil
with a rating of GL-5. The gearbox should contain
32 oz. of lubricant after refilling. To verify the proper
amount of lubricant has been filled, rotate the fill
hole on the gearbox to the 9 o'clock position. If the
lubricant appears at the base of the drain/fill hole,
the unit is filled to the proper level.
5. Reinstall the drain plug and lower the pavement
saw.
Figure 29.
MPS9 (Rev. 4/20/2007)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alitec ps9 2.5mdAlitec ps9 2.5hdAlitec ps9 4.5mdAlitec ps9 1.5hd single circuitAlitec ps9 4.5hdAlitec ps9 2.5hd single circuit ... Show all

Table of Contents