Download Print this page

GE C-Start Installation Manual page 5

3-way (multi-switch) installation
Hide thumbs Also See for C-Start:

Advertisement

STEP 7
Turn The Power Back On
After the switch is secured and faceplate mounted, turn the
power back on at the circuit breaker box.
At the switch, the light ring will flash blue indicating the device
is wired correctly and the device is in setup mode.
Light ring will continuously flash blue until the switch is added
to the C by GE app.
Light ring will flash red if the circuit is overloaded.
Max load rating 150W LED and 450W incandescent/halogen.
Light ring will not illuminate if wired incorrectly.
IF LIGHTS DON'T TURN ON:
1. Check that air gap switch is depressed.
2. Check that power to the switch is on at the breaker.
3. Turn power off at the breaker, return to the switch to confirm
the wires are securely and properly wired according to the
installation guide.
4. Go to cbyge.com/switch-support for more troubleshooting.
STEP 8
Enable 3-Way Control
in the C by GE App
Now that your switches are installed, you have one more step
to complete the 3-way connection. Next, you must enable 3-way
control by grouping the switches together in the C by GE app.
1. Download the C by GE app.
2. Add both switches to the C by GE app.
3. Create a Room in the C by GE app.
4. Add both switches to that Room.
This process virtually groups your switches together, allowing
for 3-way control. Test that your 3-way switch operates correctly.
Congratulations!
You've completed the C-Start Switch installation.
ON
Depressed,
socket powered
Switch Setup
There are 3 steps in setting up a Switch.
Install your Switch
Install your switch using instructions
included in the box.
Configure your Switch
Connect the switch to Wi-Fi, name the
switch, and add it to a room.
Enable Voice Assistant Control
Connect your switch to Amazon Alexa or
the Google Assistant.
For Help, Go To: cbyge.com/switch-support or call 1-844-30C-BYGE
OFF
Pulled out,
no power to socket
Get Started
5

Advertisement

loading