Download Print this page

Secure The Switch - GE C-Start Installation Manual

3-way (multi-switch) installation
Hide thumbs Also See for C-Start:

Advertisement

STEP 4
Connect The Wires:
The Second Switch
If you have more than two switches controlling your 3-way circuit,
this step can be repeated for any additional switch on that circuit.
1. Connect the neutral (white) wire on the switch to the neutral
(white label) wire from the wall.
2. Connect the line (black) wire on the switch to the line (black
label) wire from the wall.
3. Connect the ground (green) wire on the switch with the
ground (green label) wire from the wall.
4. Do NOT connect the load (red) wire on the switch with
the load (red or black) wire from the wall. Cap both wires
separately using two wire nuts.
5. If there is a 5th wire in the wall box (traveler wire), cap the
wire. This wire is not needed for the C by GE switch.
STEP 5
Fit Wires Into Wall Box
Neatly push the wires back into the box, rotating the switch
so it's oriented according to the image.
STEP 6

Secure The Switch

Using a Phillips screwdriver and the screws provided, secure the
switch to the wall until level and flush. Screw on the faceplate
bracket, then snap the faceplate cover onto the bracket.
STEP 3: Connect Wires
STEP 3: Connect Wires
IMAGE 4 - SECOND SWITCH NEW
IMAGE 4 - SECOND SWITCH NEW
line wire moved to bottom hole
line wire moved to bottom hole
3-Way traveler wire added
3-Way traveler wire added
load wires individually capped
load wires individually capped
3-Way Traveler Wire
3-Way Traveler Wire
STEP 4: Fit Wires Into Wall Box
IMAGE 5 - NEW
line wire moved to bottom hole
3-Way traveler wire added
load wires individually capped in 2nd illustration
First Switch
For Help, Go To: cbyge.com/switch-support or call 1-844-30C-BYGE
Second Switch
4

Advertisement

loading