Application Planning; Installation Guidelines - Siemens SIMATIC PN/BACnet LINK Operating Instructions Manual

Network transitions
Table of Contents

Advertisement

Application planning

5.1

Installation guidelines

General installation guidelines
The following guidelines must be observed when installing and connecting the PN/BACnet
LINK:
● When connecting the PN/BACnet LINK, make sure that you observe all applicable and
legally binding standards. Adhere to the relevant national and regional regulations when
installing and operating the device. Check with the local authorities regarding the
standards and rules to be followed in your particular case.
● Ensure a zero-voltage state during assembly and connection work.
● Adhere to the installation and wiring guidelines of your automation system and the
BACnet system.
Guidelines for installation of PN/BACnet LINK devices
● The PN/BACnet LINK is classified as open equipment based on standards for electrical
devices.
● You must install the PN/BACnet LINK in an enclosure, control cabinet or in a control
center. The enclosure, control panel or control center may be located in residential areas,
business and commercial areas or in a small business.
● Only authorized personnel must have access to the enclosure, control cabinet or control
center.
● Installation and operation of the PN/BACnet LINK is only permitted in a dry environment.
● Only one connection to SELV circuits is permitted. Only SELV circuits offer protection
from electric shock in a dry environment.
● The installation must offer the required mechanical protection and environmental
protection for open equipment in your specific location category according to the
applicable electrical regulations and building code.
● Proper grounding and wiring of the PN/BACnet LINK is important for optimal operation
and for sufficient immunity of your system and your application.
PN/BACnet LINK
Operating Instructions, 10/2017, A5E39895543-AA
5
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents