Connecting Bacnet Bus - Siemens SIMATIC PN/BACnet LINK Operating Instructions Manual

Network transitions
Table of Contents

Advertisement

Connecting

7.6 Connecting BACnet bus

Critical plant state
The Ethernet switch installed in the PN/BACnet LINK is only in operation after run-up of the
PN/BACnet LINK. A restart of the PN/BACnet LINK interrupts the Ethernet switch function.
Existing Ethernet connections over the switch are interrupted for the duration of the
PN/BACnet LINK startup. This can result in critical plant states.
7.6
Connecting BACnet bus
Connecting BACnet
Note
To increase the mechanical stability, a retaining collar
installed on the bottom part of the housing of the PN/BACnet LINK in the delivery state. This
retaining collar is intended for the Siemens FastConnect connectors.
58
CAUTION
The PN/BACnet LINK is connected to the BACnet
bus using an Ethernet cable with an RJ45 connector
. Use a shielded Ethernet cable (CAT5e) with a
shielded connector.
for the BACnet connector is
Operating Instructions, 10/2017, A5E39895543-AA
PN/BACnet LINK

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents