Effective August 2011 Instruction Leaflet IL29C119C Supersedes IL 29C119B Dated 10/01 Installation Instructions for E F, E FM Mining Service Circuit Breakers Contents Description Page 1.0 Introduction ......2 2.0 Installation .
Installation Instructions for E2F , E2FM Mining Service Circuit Breakers Instruction Leaflet IL29C119C Effective August 2011 WARNING DO NOT ATTEMPT TO INSTALL, ADJUST, OR PER- FORM MAINTENANCE ON EQUIPMENT WHILE IT IS ENERGIZED. SEVERE PERSONAL INJURY, DEATH, OR SUBSTANTIAL PROPERTY DAMAGE CAN RESULT FROM CONTACT WITH ENERGIZED EQUIP- MENT.
Page 3
Installation Instructions for E2F , E2FM Mining Service Circuit Breakers Instruction Leaflet IL29C119C Effective August 2011 WARNING Line End BEFORE MOUNTING THE CIRCUIT BREAKER IN AN ELECTRICAL SYSTEM, MAKE SURE THE CIRCUIT BREAKER IS SWITCHED TO THE OFFPOSITION AND THAT THERE IS NO VOLTAGE PRESENT WHERE WORK IS TO BE PERFORMED.
Installation Instructions for E2F , E2FM Mining Service Circuit Breakers Instruction Leaflet IL29C119C Effective August 2011 (See accessory schematic diagram on side of cir- 3.0 MANUAL OPERATION cuit breaker.) Manual operation of the circuit breaker is controlled by the circuit breaker handle and the PUSH-TO-TRIP but- Note: If terminal shield or interphase barriers are to ton.
Installation Instructions for E2F , E2FM Mining Service Circuit Breakers Instruction Leaflet IL29C119C Effective August 2011 Remove dust, dirt, soot, grease, and/or moisture 4.1. from the surface of the circuit breaker using a free dry cloth, brush, or vacuum cleaner. Do not blow debris into circuit breaker.
Page 8
OF DEALING OR USAGE OF TRADE, ARE MADE REGARDING THE INFORMATION, RECOMMENDATIONS, AND DESCRIPTIONS CONTAINED HEREIN. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental or consequential damage or loss...