Connection To The Supply; Adding Accessories To Slam ® Hornet; Linking In Series - Saurya SLAM Hornet EM 1LED Instructions For Safe Use

Table of Contents

Advertisement

Note! Lack of equipotential bonding may cause danger in Ex –area, therefore please pay special
attention to all installations of yours involving metallic parts. Static charging is especially noted on
standards referring to installations in explosion hazardous areas (e.g. EN/IEC 60079-14).
3.6

Connection to the supply

It is recommended that the unit is first connected to the mains / transformer before entering the
explosion hazardous area. Potential equalization should be arranged by the operator prior entering
explosion hazardous area.
®
SLAM
Hornet units with 2-pole supply (without bonding connection) can be taken to explosion
hazardous area without connecting it to the supply first.
Requirements for supply (electricity)
The following main requirements should be taken into account:
Supply voltage: Variation may be maximum ±6% from the value stated in the unit type label.
Current: Maximum current of the system is 16 A.
Frequency: Standard 50 Hz if not otherwise stated in the type label.
Fuse protection: The supply has a fuse with a breaking capacity of at least 1500 A.
Earth Leakage Circuit Breaker (ELCB): It is recommended to use a supply with 30 mA ELCB.
Please observe the type label for further data. Luminaires for 110 VAC or 230 V supply are to be
connected to a supply incorporating protective earth conductor.
3.7
Adding accessories to SLAM
Atexor provides a number of different accessories but in case you afterwards want to add accessories
of your own for the SHEM unit, please note the following points:
1. The user is fully responsible for the use of the equipment including service and maintenance
2. In case of adding accessories the following is mandatory
a. The construction of the certified unit shall not change
b. The IP class of the unit shall not decrease
3. The static electricity is taken account (e.g. electrostatic bonding)
In case you do not want to do your own risk assessment for the accessories please view the
whole range of accessories at
3.8

Linking in Series

®
Certain SLAM
Hornet units may be equipped with Ex-certified socket in the factory. Sockets are
considered as one option so they are added to the unit upon customer's special request.
10/16
®
www.atexor.com
Hornet

Advertisement

Table of Contents
loading

Table of Contents