Installation - Carrier Puron 38TZA Installation And Start-Up Instructions Manual

12, 13, 14 seer split-system air conditioners
Hide thumbs Also See for Puron 38TZA:
Table of Contents

Advertisement

NOTE:
Avoid contact between tubing and structure
OUTDOOR WALL
CAULK
INSULATION
THROUGH THE WALL
HANGER STRAP
(AROUND VAPOR
TUBE ONLY)
1" MIN.
SUSPENSION
Fig. 2—Connecting Tubing Installation

INSTALLATION

Specifications for this unit in residential new construction market
require the outdoor unit, indoor unit, refrigerant tubing sets,
metering device, and filter drier listed in presale literature. There
can be no deviation. Consult the Application Guideline and
Service Manual for Residential Split-System Air Conditioners and
Heat Pumps using Puron™ Refrigerant to obtain required unit
changes for specific applications and for R-22 retrofit.
Step 1—Check Equipment and Job Site
UNPACK UNIT
Move to final location. Remove carton taking care not to damage
unit.
INSPECT EQUIPMENT
File claim with shipping company prior to installation if shipment
is damaged or incomplete. Locate unit rating plate on unit corner
panel. It contains information needed to properly install unit.
Check rating plate to be sure unit matches job specifications.
Step 2—Install on a Solid, Level Mounting Pad
If conditions or local codes require the unit be attached to pad, tie
down bolts should be used and fastened through knockouts
provided in unit base pan. Refer to unit mounting pattern in Fig. 3
to determine base pan size and knockout hole location.
On rooftop applications, mount on level platform or frame. Place
unit above a load-bearing wall and isolate unit and tubing set from
structure. Arrange supporting members to adequately support unit
and minimize transmission of vibration to building. Consult local
codes governing rooftop applications.
Roof mounted units exposed to winds above 5 mph may require
wind baffles. Consult the Application Guideline and Service
INDOOR WALL
LIQUID TUBE
VAPOR TUBE
JOIST
INSULATION
VAPOR TUBE
LIQUID TUBE
A94028
3 /8 -
IN. DIA TIEDOWN
KNOCKOUTS IN BASEPAN
(2) PLACES
VIEW FROM TOP
Dimensions (In.)
MINIMUM
UNIT
MOUNTING PAD
SIZE
DIMENSIONS
024–060
26 X 32
Fig. 3—Mounting Unit to Pad
Manual for Residential Split-System Air Conditioners and Heat
Pumps using Puron™ Refrigerant for wind baffle construction.
NOTE: Unit must be level to within ± 2° (± 3/8 in./ft) per
compressor manufacturer specifications.
Step 3—Clearance Requirements
When installing, allow sufficient space for airflow clearance,
wiring, refrigerant piping, and service. Allow 30-in. clearance to
service end of unit and 48 in. above unit. For proper airflow, a 6-in.
clearance on 1 side of unit and 12 in. on all remaining sides must
be maintained. Maintain a distance of 24 in. between units.
Position so water, snow, or ice from roof or eaves cannot fall
directly on unit.
On rooftop applications, locate unit at least 6 in. above roof
surface.
Step 4—Operating Ambients
The minimum outdoor operating ambient in cooling mode is 55°F,
and the maximum outdoor operating ambient in cooling mode is
125°F.
Step 5—Check Indoor Accurater® Piston and Install
Piston Ring (38TXA/38TZA-Standard)
If unit is to be installed with a piston metering device, proceed as
follows:
1. Check indoor coil piston to see if it matches the required
piston shown on outdoor unit rating plate. If it does not match,
replace indoor coil piston with piston shipped with outdoor
unit. The piston shipped with outdoor unit is correct for any
approved indoor coil combination.
2. After correct piston is installed, locate neoprene piston ring
shipped in piston bag. Install piston ring behind metering
piston as shown in Fig. 4. The piston ring ensures that piston
stays seated during all operating conditions.
2
A
C L
"
3
8
/
16
A97548
TIEDOWN KNOCKOUT LOCATIONS
A
B
4
9-3/4
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Puron 38txaPuron 38tsa