Heater Gas And Electricity Line Connection Schema - Maktek MR20 Installation, Usage And Maintenance Manual

Radiant heater
Table of Contents

Advertisement

GAS, ELECTRICITY AND CHIMNEY CONNECTION
Maximum work pressure is 20mbar for natural
gas. Radiator gets harm above these pressure.
Do not get connected unless checking network
gas pressure.
NOTE:
Radiant is designed for working onlt with natural gas and it is forbidden to transform other gas types for any reason.
In case of disobeying the ban, radiant will be out of warranty and producer company can not be held responsible for financial and emotional damage
caused from this.
WARNINGS ABOUT WASTE GAS
1-IF THE RUNNING PLACE OF THE RADIANT, IS OPEN
Waste gas can be left in open areas.If there is flammable material or stuff near the waste
gas outlet, waste gas must be removed with 90 degree elbows.
2- IF THE RUNNING PLACE OF THE RADIANT, IS CLOSED
Waste gas must remove from the place by a chimney in closed places. Until 3 meter
distance 60 chimney pipe, more than 3 meter distance 80 chimney pipe must be used.
Maximum chimeny length is 6 meters.
3-MAKING CHIMNEY CONNECTION
When chimney connection is making, chimney must be connected with a down slope to
prevent first burning perspiration and rain water to canalise towards radiant.
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mr30Mr40Mr55

Table of Contents