Inspection After Assembling - Sharp KP-19S Service Manual

Electric jar pot
Table of Contents

Advertisement

On completion of assembling, the following should be inspected.
1. Verifi cation of operations
1.1 Is there any part left uninstalled (magnet plate, in particular) ?
1.2 Is there any wrong wiring ?
1.3 Is the body engaged securely with the upper ring and bottom cover ?
1.4 Are screws tightened fi rmly ?
2. Measurement of insulation resistance
2.1 Measure the insulation resistance by a 500V d.c. insulation resistance meter and be sure that
resistance in at least 1 MΩ. (Check it before and just after the performance test.)
2.2 Be sure that the unit can stand against a 1000V a.c. high voltage for one minute. (Check it just
after the performance test.)
3. Boiling and warming capacity
3.1 Fill the pot full of water (up to the full-water level) and boil it. Be sure that hot water temperature
is more than 90
3.2 After boiling, the "WARM" lamp should light up instead of the "BOIL" lamp.
3.3 Approximate one hour after boiling, be sure that the hot water temperature still stays at 80
4. Water discharge capacity
After checking the boiling-warming capacity, keep the hot water quantity at its discharge level and
make sure that the hot water is discharged by 150 ml in average when the push button is pressed.
(Water discharge in average = ________________________________ )
If the hot water quantity is insuffi cient, recheck that the bellow packing-B, inner lid packing, etc.
Due to the troubleshooting guide.

INSPECTION AFTER ASSEMBLING

o
C.
Number times of pressing the button
Total water discharge
11
o
C or more.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kp-30sKp-30stKp-36s

Table of Contents