Step 2-3: Heat Sink Installation - Gigabyte GS-SR326 System Installation Manual

Rack mount/tower server
Table of Contents

Advertisement

3. The noticed corner should point toward the end of
lev er. The CP U will only it in the orientation as
shown below.

Step 2-3: Heat Sink Installation

1. Put the heat heak on the retention module.Unscrew and pull up the holding bracket.
Hardw are Installation Process
4. Then, align the CPU and insert it into the socket.
Then, push the lever to the original position.
2. Hook one end of the cooler bracket to the CPU.
Make sure middle part of bracket is clicked into the
desired position. Then, hook the other end of the
cooler bracket by gripping it to another side of reten-
tion module
11

Advertisement

Table of Contents
loading

Table of Contents