Prepare the installation site.

Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation of
low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
• 120/60/1-5 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
Drain
(3/4" Barb)
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least
1/4" per foot pitch (6,4mm/0,3m).
Refrigeration lines
• 7/8" ∅ (22,4 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
Cornelius • RIDE Technology
(3/8" push-in internal connection, 3/8" OD tubing required)
remote condensing

Site preparation

7/8" ∅ (22,4mm)
3/8" ∅ (9,5mm)
1/4" per foot
(6,4 mm per 0,3 m)
2
2 ft. x 1" OD
silicone tubing
and ttings
provided
NEMA
5-15
5

Advertisement

Table of Contents
loading

Table of Contents