3.23 BOILER REGISTRATION.

This Commissioning Checklist is to be com-
pleted in full by the competent person who
commissioned the boiler as a means of dem-
onstrating compliance with the appropriate
Building Regulations.
Failure to install and commission according to
the manufacturer's instructions and complete
this Commissioning Checklist may invalidate
the warranty.
Customer name:
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT NAME):
Company name:
Company address:
Commissioning date:
Certificate of compliance number:
CONTROLS (tick the appropriate boxes)
Time and temperature control to heating
Time and temperature control to hot water
Heating zone valves
Hot water zone valves
Thermostatic radiator
Automatic bypass to system
Boiler interlock
ALL SYSTEMS
The system has been adequately flushed and cleaned?
What system cleaner was used?
What inhibitor was used?
Has a system filter been installed?
HEATING MODE measure and record:
Burner inlet gas working pressure (at maximum rate)
Central heating flow temperature
Central heating return temperature
COMBINATION BOILER - DOMESTIC HOT WATER MODE measure and record:
Burner inlet gas working pressure (at maximum rate)
Cold water inlet temperature
Hot water has been checked at all outlets
Has a DHW tempering valve been fitted to sanitary fittings?
Water flow rate
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance local laws in force?
ALL INSTALLATIONS
At max. Rate:
Record the following:
At min. Rate: (where possible)
The heating and hot water system complies with the appropriate Building Regulations
The boiler and associated products have been installed and commissioned in accordance with the manufacturer's instructions
The operation of the boiler and system controls have been demonstrated to and understood by the customer
The manufacturer's literature, including Commissioning Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To confirm satisfactory demonstration and receipt of manufacturer's literature)
Telephone number:
Plumbing license number:
Telephone number:
Commissioning date:
Room thermostat and programmer/timer
Weather compensation
Cylinder thermostat and programmer/timer
Kpa
Kpa OR gas inlet pressure at maximum rate
Co
Ppm Co
Co
Ppm Co
29
Programmable room thermostat
Fitted
Fitted
Fitted
Fitted
Quantity
Yes
OR gas inlet pressure
Yes
Yes
%
Ratio CO/CO
²
%
Ratio CO/CO
²
Optimum start control
Combination boiler
Not required
Not required
Not required
Not required
Provided
Yes
Litres
No
Kpa
°C
°C
Kpa
°C
Temperature
°C
Temperature
°C
I/min
Yes
Ratio
Ratio
Yes
Yes
Yes
Yes

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INTEC 30 System External and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Intec 12 system externalIntec 30 combi external

Table of Contents

Save PDF