Application
Power ON
T
ready
The ON/~OFF signal level is detected about 250ms after VBATT is available.
Note:
This timing might be temperature dependant.
WA_DEV_W228_PTS_002
Figure 34. Example of the ON/~OFF Pin Connection
Figure 35. Power-ON Sequence
Table 28. Power-ON Sequence
Minimum (s)
4
5
Rev 001
Product Technical Specification &
Customer Design Guidelines
Typical (s)
Maximum (s)
7
Page 73 of 108