Fluke 9000A-Z80QT Instruction Manual page 16

Interface pod
Table of Contents

Advertisement

ZBOQT
to
Be
sure
processor socket.
The self test socket
insert any
not
into this socket.
Connect the pod between the mainframe and the UUT as follows:
Remove power
1.
Using the
2.
shown in Figure
Secure the
Apply power to the mainframe.
3.
Perform
4.
With UUT power off, unplug the microprocessor from the UUT.
5.
On the
6.
from the self test socket.
Align the
7.
that
notched corner
the
socket. Insert the plug into the socket as shown in Figure
Electrically reassemble the UUT. Use extender boards if necessary.
8.
Make
sure
order to activate pod protection circuits.
in
Apply power to the mainframe and the UUT.
9.
POWER CONNECTIONS
2-3.
The pod receives
external power connections are required.
2—2
ribbon
install the
intended
is
microprocessor
from
the UUT. Remove power from the mainframe.
round
shielded cable, connect the pod to the mainframe
(for 9000 Series)
2-1
connector
using the sliding collar.
of
the pod as described
self—test
a
pod, turn
the self test socket thumbwheel to release the plug
ribbon-cable
with the microprocessor socket on the UUT
ofthe
CAUTION
mainframe power
volts, and
+5
volts,
-5
cable plug correctly in the UUT micro-
for
ribbon
use with the
from
removed
a UUT, or any
or
Figure
in
ribbon
cable plug aligns with pin
on before turning
is
volts from the mainframe. No
+12
cable plug only. Do
other
2-2
(for
9100
Series).
ofthis
Section
manual.
5
1
2-3.
UUT
power on
device
as
so
of
the

Advertisement

Table of Contents
loading

Table of Contents