Chapter 4
Note:
The machine may only be commissioned and operated by trained and authorised personnel!
Note:
For optimal operation of the machine the surrounding temperature has to be between 10°C and
35°C.

Unpacking / set up

The UNIFLEX machine was tested prior to delivery and is delivered ready for operation.
How to prevent damage when unpacking:
Carefully remove all packaging.
Check the delivery for completeness using the delivery note.
Remove the four screws in the corners of the fastening.
Use a fork lift truck to lift the hose crimping machine off the palette.
Note:
Pay attention to the correct balance!
Set the hose crimping machine on a stable and level work bench.
Note:
The hose crimper needs to be placed so that it is accessible from all sides for maintenance works.
The work bench needs to be able to support the weight.
Fasten the machine feet to the work bench.
HM 200 Ecoline
Rear view Connections
P
P
T
P Pump Connection
T Connection to oil tank
UNIFLEX-Hydraulik - 12 - www.uniflex.de
Commissioning