Bunn MHG Series Installation And Operating Manual

Bunn MHG Series Installation And Operating Manual

Multi-hopper grinder and storage system for use with smart funnel
Hide thumbs Also See for MHG Series:

Advertisement

MHG
Multi-Hopper Grinder and Storage System for use with Smart Funnel
®
INSTALLATION AND OPERATING GUIDE
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts Catalog, Programming Manual, or
Service Manual, please visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain
the latest catalog and manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
Bunn-O-Matic Corporation
Post Office Box 3227, Springfield, Illinois 62708-3227
Phone (217) 529-6601 | Fax (217) 529-6644
www.bunn.com
36529.0001 H 05/19 © 2011 Bunn-O-Matic Corporation

Advertisement

Table of Contents
loading

Summary of Contents for Bunn MHG Series

  • Page 1 To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and manual updates.
  • Page 2 AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND. In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
  • Page 3: Table Of Contents

    Adjustments may be made to alter both the amount and grind from the factory setting. Please visit www.bunn.com/product-manuals to find a complete programming manual that will guide you through settings to adjust or modify. Topics include: program lockout, modify recipes, set password, set language, test outputs/frequencies, grind counters, serial asset number, software update, and more.
  • Page 4: Ce Requirements

    NORTH AMERICAN REQUIREMENTS • This appliance must be installed in locations where it can be overseen by trained personnel. • For proper operation, this appliance must be installed where the temperature is between 41°F to 95°F (5°C to 35°C). • Appliance shall not be tilted more than 10° for safe operation. •...
  • Page 5: Electrical Requirements

    ELECTRICAL REQUIREMENTS Refer to Data Plate on the Grinder, and local/national electrical codes to determine circuit requirements. This grinder has an attached cordset and requires 2-wire, grounded service rated: 120 volts ac, 15 amp, single phase, 60 Hz, for domestic grinders. 220-240 volts ac, 10 amp, single phase, 50 Hz, for most international grinders.
  • Page 6: Operating Controls

    INITIAL SET-UP & PROGRAMMING (Continued) OPERATING CONTROLS (Early Models) (left) (right) Grind Pad (a) – Pressing initiates a grind cycle. Stop Pad (b) – Pressing ends the operation of the grinder. ® Pads (c) – “Hidden” buttons used to navigate setup and programming menus. Pads (d) –...
  • Page 7 INITIAL SET-UP & PROGRAMMING (Continued) OPERATING CONTROLS (left) (right) GRIND STOP Grind Pad (a) – Pressing initiates a timed grind cycle. Stop Pad (b) – Pressing ends the operation of the grinder. Pads (c right) – Hold “Hidden” button 2 seconds to ENTER programming, then use to navigate setup and programming menus.
  • Page 8: Name Hopper

    RECIPES installed on top of the grinder as described in the Installation and Operating manual, available on SELECT SELECT SELECT the BUNN website. Modify Recipes This option allows the operator to modify recipes stored in programming. REVIEW RECIPES ORIGINAL GRIND TIME: 2.7...
  • Page 9: Coffee Grinding

    INITIAL SET-UP & PROGRAMMING (Continued) Modify Recipes (cont) 13. Use the plus (+) or minus (-) buttons under the display to increase or decrease the run time. 14. Select DONE to proceed with the changes. 15. The next screen will ask “3 BATCHES DONE?”. If so, select YES to save the changes. Selecting NO will allow the operator to make more adjustments to the remaining batches for that particular recipe.
  • Page 10: Cleaning

    5. Clean and sanitize the hoppers and lids. Care should be taken not to scratch the hoppers with any abrasive materials. NOTE: Bunn-O-Matic recommends the 3-step method for cleaning and sanitizing the hoppers and lids. The 3-step method consists of hot soapy water using an approved detergent, a fresh water rinse, and an aqueous sanitizing solution using an approved non-chlorine sanitizer.
  • Page 11: Preventive Maintenance

    PREVENTIVE MAINTENANCE BUNN recommends that preventive maintenance be performed at regular intervals. Maintenance should be performed by a qualified service technician. For technical service, contact BUNN at 1-800-286-6070. NOTE: Replacement parts or service caused by failure to perform required maintenance is not covered by warranty.

Table of Contents