Control Board; Battery Installation - Vermont Castings Radiance RADVT Series Installation & Operating Manual

Direct vent gas heater
Table of Contents

Advertisement

5
Signature Command Operating Instructions
A. Features -
B. Control Board
battery
• Embedded Compact 120 VAC Adapter with Auto Battery
• Countdown 6 hr Timer
• Standard Thermostatic Control Mode
• Three Speed Control for Blower
3535
Vermont Castings • Radiance RADVT Installation Manual_R20 • 09/18
Conversion

Control Board

Master Switch
Battery Door
Command Center
Figure 5.1
E. Battery installation
To Thermopile
To Sensor
To Sparker
To Command
Center
To Stepper Motor
To Valve
AC Module
3-90-20306759

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents