Monthly Vera-Lift™ Inspection Checklist - Vancare Vera-Lift V350 Operating Manual

Table of Contents

Advertisement

MONTHLY VERA-LIFT™ INSPECTION CHECKLIST
INSTRUCTIONS: Use one page for each VERA-LIFT™. Check each blank as that item is inspected. Note date inspected, initials of
maintenance staff member who performed inspection and repairs or adjustments made in the "COMMENTS" column.
Serial Number of Lift
JAN
Check nuts & bolts for
tightness
Inspect welds for cracks,
rusting & damage
Remove lids & inspect
wire connections
Check casters for
tightness/lint
Check battery voltage
while lift is in operation*
Check battery charger
output (27.6 volts + or-
.5 volts)
*13.2 volts if fully charged, approx. 12.0 volts if partially discharged (+ or - .5 volt). If voltage decreases by 4 – 5 volts, change the battery.
Please follow the maintenance and inspection procedures outlined in the product manuals and record accordingly.
Based on institutional average usage data, Vancare recommends that all lifts be replaced every ten years or sooner
based upon the facilities usage and the findings during regular use, maintenance and inspections.
April 2013
November 2017
FEB
MAR
APR
MAY
For your nearest Distributor, call 1-800-694-4525
For your nearest distributor, call 1-800-694-4525
JUN
JUL
AUG
SEP
Year
OCT
NOV
DEC
COMMENTS
29
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vera-lift v600Vera-lift v800Vera-lift v600 w/scale

Table of Contents