Advertisement

STORAGE SOLUTIONS FOR THE FUTURE
SOLTARO All-In-One ESS
USER MANUAL
161-00024, Rev. 01_18_EN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the All-In-One ESS and is the answer not in the manual?

Questions and answers

Summary of Contents for Soltaro All-In-One ESS

  • Page 1 STORAGE SOLUTIONS FOR THE FUTURE SOLTARO All-In-One ESS USER MANUAL 161-00024, Rev. 01_18_EN...
  • Page 2: Product Specifications

    Wuxi Soltaro Energy Technology Co., Ltd. and its licensors. This material may not be modified, reproduced or copied, in whole or in part, without the prior written permission of Wuxi Soltaro Energy Technology Ltd. and its licensors. Additional information is available upon request. The following are trademarks or registered trademarks of Wuxi Soltaro Energy Technology Ltd.
  • Page 3: Important Safety Instructions

    Warning: Soltaro is heavy and challenging to lift. Warning: Use Soltaro LFP Battery only as directed. Warning: Do not use Soltaro LFP Battery if it is defective, appears cracked, broken, or otherwise damaged, or fails to operate. Warning: Before beginning the wiring portion of the installation, first power off the inverter and then open the AC and DC disconnect switches (if applicable for the installation).
  • Page 4: Environmental Conditions

    Caution: Do not place Soltaro LFP Battery in a storage condition for more than one (1) month, or permit the electrical feed on the Soltaro LFP Battery to be severed for more than one (1) month, without placing Soltaro LFP Battery into a storage condition in accordance with Soltaro’s storage specifications.
  • Page 5 Warning: Do not expose the Soltaro LFP Battery to ambient temperatures above 60°C (140°F) or below -30°C (-22°F). Caution: Ensure that no water sources are above or near Soltaro LFP Battery, including downspouts, sprinklers, or faucets. Soltaro LFP Battery User Manual...
  • Page 6 Soltaro All-in-one ESS is a lithium-ion(LiFePO4) battery system that turns solar panels into an all-day resource while offering backup power in the event of a grid outage. Soltaro All-in- one ESS enables storage of renewable energy, allowing optimized home energy control and an increasing amount of total electricity production to come from renewable sources.
  • Page 7: Specifications

    Specifications Sinlion LFP Battery User Manual...
  • Page 8: Standard Packing List

    Standard Packing List Hybrid/AC Coupled Inverter4.5KWH LFP Battery Inverter Backsheet Battery Backsheet Inverter Holder Inverter Positioner Battery<-->Inverter Battery<-->Inverter Rj45 Power Cables 25mm2 Communication Cable M6 Expansion Screws M5/M4/M8 Hexagon Socket Head Cap Screw Sinlion LFP Battery User Manual...
  • Page 9 SOLTARO ENERGY METER 2. WIND/SOLAR/DIESEL/STORAGE MICRO-GRID SYSTEM 3. ASYMMETRIC LOAD ON THE THREE-PHASE GRID IS NO BASED ON SOLTARO AC COUPLED ALL IN ONE ESS PROBLEM FOR SOLTARO AC COUPLED ALL IN ONE ESS PV GENERATOR PV GENERATOR WIND GENERATOR...
  • Page 10: Mechanical Installation

    Mechanical Installation Step-1, Confirm the exact mounting position of battery backsheet- Please use expansion screws 180mm to fix the battery back sheet on the Minimum 434.58mm wall according to above ground. the fixed position. 434.58mm Step-2, Hanging on the battery module to the mounted battery backsheet- Step-3, Select the right Inverter back-positioner to the inverter holder(only one shall be chosed) Distance to wall with two options-...
  • Page 11 Rj45 connector and plug-in the battery COM interface-if one battery connected, either Up or Down is ok, if for multi batteries parallel connection, please refer to following page. CAN-H CAN-H CAN-L CAN-L 485A 485A NULL NULL 485B 485B Soltaro Battery Soltaro Inverter Sinlion LFP Battery User Manual...
  • Page 12 Mechanical Installation Step-6, Fix the cables cover onto battery Screw back the 4PCS M hexagon socket head cap screws(from battery accessories) to fix the cables cover back onto battery module, please guarantee the tightness in case installing the ESS outside house. Step-7, Mounting the inverter P l e a s e r e m o v e t h e b l a c k protection plate from inverter...
  • Page 13: Electric Connection

    Step-8, Screw the waterproof terminals onto inverter holder Please screw the water proof terminals onto inverter holder, to make it ready for all-in-one ESS cables in/out. Step-9, Cables connection inside Soltaro All-in-one ESS Hybrid Inverter Interface Smart Meter Terminal Grid AC Cable...
  • Page 14: System Setting

    System Setting Step-10, Battery&Inverter Setting Please refer to following manuals- Hybrid Inverter- document “ Manual Soltaro Hyper-LV-1P-EU1.04 ” AC Coupled Inverter-document “ Manual Soltaro Retro-LV-1P-EU1.04 ” Step-11, How to start the system? Please refer to following manuals- Hybrid Inverter- document “...
  • Page 15: Normal Operation

    Caution: Do not try to communicate with Soltaro LFP Battery using third party tools or diagnostics between Soltaro LFP Battery and the inverter. Caution: Do not lean on, stack anything on top of, or hang anything from Soltaro LFP Battery or the conduit.

Table of Contents