Figure 18 Breaker configurations when using a UPS
Data connection diagrams
This section provides basic cabling diagrams for connecting ENC (data and
control) cables between the control chassis and the drive chassis in the block
module, and between the controller and HNAS storage in the file module.
The following illustrations show the correct way to connect the drive chassis
to the controller.
Site preparation
93
Hitachi Virtual Storage Platform G1000, G1500, and Virtual Storage Platform F1500 Hardware Guide