Preparations Before Installation; Indoor Unit Installation - Daikin FXLQ-M Series Engineering Data

Floor standing type/concealed floor standing type
Table of Contents

Advertisement

Appendix
PREPARATIONS BEFORE INSTALLA-
TION
(1) Positioning of holes for fastening to the wall
Model
07 · 09 type
12 type
18 · 24 type
(2) How to open / close the front panel (FXLQ)
2
1. Open the lid of control panel (both left and right)
2. Remove screws (both left and right) that lock the knobs
in position.
3. Push the knobs (both left and right) to the rear.
4. Lift the front of the top plate.
5. Lower the front panel towards the front of the unit.
To close, perform the procedure in opposite order. Pull
towards the front of the unit the knob snaps in place.
5
5
A
A
[unit: in. (mm)]
23 1/4 (590)
28 3/4 (730)
39 3/4 (1010)
1
4
4
5
3

5. INDOOR UNIT INSTALLATION

As for the parts to be used for installation work, be sure to use
Daikin.
(1) Level the indoor unit with the leveling screws (7). If
Leveling screws (7)
(accessory)
(2) If the unit is in danger of falling over, either fasten to
the wall using the holes provided, or fasten to the
(3) The legs can be retracted if the indoor unit is to be
hung on a wall. To do so, lift the legs as shown in the
FXLQ
Lift legs.
Lift legs.
FXNQ
NOTE
1. Use the installation mount for installation. Check whether
the wall is strong enough to bear the weight of the unit or
not. If there is a risk, reinforce the wall before installing the
unit.
2.
the underside for air intake. Also, ensure the unit is level
water can leak.
3. The quality of the wall could affect operating sound.
3P086154-3R
EDUS391502-F7
English
3P086154-3R
FXLQ-M / FXNQ-M

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents