Download Print this page
HP EliteBook 840 G4 Product End-Of-Life Disassembly Instructions

HP EliteBook 840 G4 Product End-Of-Life Disassembly Instructions

Notebook pc
Hide thumbs Also See for EliteBook 840 G4:

Advertisement

Product End-of-Life Disassembly Instructions
Product Category: Notebooks and Tablet PCs
Marketing Name / Model
[List multiple models if applicable.]
HP EliteBook 840 G4 Notebook PC
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions
for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU
directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as
applicable.
Item Description
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
Batteries
Mercury-containing components
Liquid Crystal Displays (LCD) with a surface
greater than 100 sq cm
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring
greater than 2.5 cm in diameter or height
External electrical cables and cords
Gas Discharge Lamps
Plastics containing Brominated Flame Retardants
weighing > 25 grams (not including PCBs or PCAs
already listed as a separate item above)
Components and parts containing toner and ink,
including liquids, semi-liquids (gel/paste) and toner
Components and waste containing asbestos
Components, parts and materials containing
refractory ceramic fibers
EL-MF877-00
Template Revision B
Notes
With a surface greater than 10 sq cm
All types including standard alkaline and lithium
coin or button style batteries
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Includes background illuminated displays with gas
discharge lamps
Include the cartridges, print heads, tubes, vent
chambers, and service stations.
PSG instructions for this template are available at
EL-MF877-01
Quantity
of items
included
in product
6
2
0
1
0
0
0
0
0
0
0
0
0
Page 1

Advertisement

loading

Summary of Contents for HP EliteBook 840 G4

  • Page 1 Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
  • Page 2 Components, parts and materials containing radioactive substances 2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed. Tool Description Tool Size (if applicable)
  • Page 3 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Connery/Travolta FA DIS ASS‘Y Sub-assembly name: Connery/Travolta 14” & 15” FA DIS ASS'Y SOP Document No.: Written by: Vick Weng Revision: Date: 2016/10/26 Page: A. Current station version list Station Ver. Station Ver. Station Ver.
  • Page 4 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 1(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble SD Dummy & Rubber Step: 1. Disassemble SD Dummy Card. 2. Remove rubber A/B/C/D/F. SD Dummy Card Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 5 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 2(1/1) Station : 2016/10/26 Name Ver. : Date Loosen Bottom Case Screws 14” Step: 1. Loosen screw * 6. (14”) 2. Loosen screw * 7. (15”) Fig.1 15”...
  • Page 6 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 3(1/1) Station : 2016/10/26 Name Ver. : Date Loosen Bottom Case Screws 14” Step: 1. Loosen screw * 5. (14”) 2. Loosen screw * 5. (15”) Fig.1 15”...
  • Page 7 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 4(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble Bottom Case Step: 1. Disassemble bottom case. (Fig.1) 2. Put the bottom case in box. (Fig.2) Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 8 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 5(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble Battery Step: 1. Loosen battery screw * 2. 2. Disassemble battery by pulling the strap. Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (#1)
  • Page 9 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 6(1/1) Station : 2016/10/26 Name Loosen HDD Set Screws Ver. : Date Step: 1. Loosen HDD set screw * 4. (Fig.1) Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (#1)
  • Page 10 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 7(1/1) Station : 2016/10/26 Name Loosen HDD BRKT Screws Ver. : Date Step: 1. Slide the HDD mylar strap to the right. (Fig.1) 2. Loosen HDD BRKT screw* 4. (Fig.2/ Fig.3) 3.
  • Page 11 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 8(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble DDR Step: 1. Disassemble DDR. (Fig.1) Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 12 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 9(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble SSD Card (for SSD Model) Step: 1. Loosen screw * 1. 2. Disassemble SSD card. Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (#1)
  • Page 13 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 10(1/1) Station : 2016/10/26 Name Ver. : Date Loosen K/B Screws Step: 1. Loosen K/B screw. 14” * 2. (Fig.1) 15” * 4. (Fig.2) 2. Poke the position marked in white square. (Fig.3) 14”...
  • Page 14 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 11(1/2) Station : 2016/10/26 Name Ver. : Date Disassemble Keyboard Step: 1. Turn the notebook over. 2. Disassemble keyboard. (Fig.1) Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 15 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 11(2/2) Station : 2016/10/26 Name Ver. : Date Disassemble FFC Fig.1 Step: 1. Disassemble KB FFC. (Fig.1) 2. Disassemble stick point FFC, backlight FFC. (Fig.2 / Fig.3 / Fig.4) Fig.1 Fig.3 Fig.2...
  • Page 16 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 12(1/1) Station : 2016/10/26 Name Ver. : Date Rip Mylar Step: 1. Rip mylar * 2 from keyboard. 2. Rip mylar * 1 from keyboard. 3. Put the Keyboard in box. 15”...
  • Page 17 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 13(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble F/P FFC Step: 1. Disassemble F/P FFC. 2. Turn the notebook over. Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 18 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 14(1/1) Station : 2016/10/26 Name Disassemble WWAN Antenna Ver. : Date Step: 1. Rip acid tape. (Fig.1/Fig.2) 2. Disassemble antenna plug from WWAN module. (Fig.3/ Fig.4) Fig.2 Fig.1 Fig.3...
  • Page 19 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 15(1/1) Station : 2016/10/26 Name Disassemble WWAN Card Ver. : Date Step: 1. Loosen screw * 1. (Fig.1/Fig.2) 2. Disassemble WWAN card. (Fig.3) Fig.1 Fig.2 Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 20 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 16(1/1) Station : 2016/10/26 Name Disassemble WLAN Card Ver. : Date Step: 1. Disassemble antenna plug from WLAN module. . (Fig.1) 2. Loosen screw * 1. (Fig.2) 3.
  • Page 21 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 17(1/1) Station : 2016/10/26 Name Disassemble Antenna Cable Ver. : Date Step: 1. Rip acid tape * 2. (Fig.1) 2. Disassemble WLAN cable & WWAN cable. (Fig.2) Fig.1 Fig.2...
  • Page 22 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 18(1/1) Station : 2016/10/26 Name Disassemble Power/B FFC Ver. : Date Step: 1. Disassemble power button/B FFC from M/B CNTR. (Fig.1/Fig.2) 14” Fig.1 Fig.1 15” Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 23 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 19(1/1) Station : 2016/10/26 Name Disassemble e.DP Cable Ver. : Date Step: 1. Rip the gasket that is on e.DP cable. (Fig.1) 2. Disconnect e.DP cable & touch cable from M/B CNTR.
  • Page 24 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 20(1/1) Station : 2016/10/26 Name Ver. : Date Loosen Screws Step: 1. Loosen screw * 4. (14”) 2. Loosen screw * 4. (15”) 14” 15” Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 25 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 21(1/1) Station : 2016/10/26 Name Ver. : Date Loosen Screws Step: 1. Loosen screw * 7. (14”) 2. Loosen screw * 6. (15”) 14” Fig.1 15” Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 26 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 22(1/1) Station : 2016/10/26 Name Ver. : Date Loosen Screws & Disassemble Frame Step: 1. Loosen screw * 4. (14”) Loosen screw * 5. (15”) 2. Disassemble frame. 14”...
  • Page 27 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 23(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble Smart Card Board FFC Step: 1. Disassemble smart card FFC. (Fig.1 / Fig.2) 14” Fig.1 Fig.2 Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 28 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 24(1/1) Station : 2016/10/26 Name Loosen Screws & Disassemble Cable Ver. : Date Step: 1. Loosen fan set screw * 2. (Fig.1) 2. Disassemble speaker cable from M/B CNTR. (Fig.2) 3.
  • Page 29 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 25(1/2) Station : 2016/10/26 Name Loosen USB/B Screws Ver. : Date Step: 1. Loosen USB/B screw * 2. (Fig.1 / Fig.2) 14” Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (#1)
  • Page 30 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 25(2/2) Station : 2016/10/26 Name Loosen M/B Screws Ver. : Date Step: 1. Loosen M/B screw *2. (Fig.1 / Fig.2) 14” Fig.1 15” Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (#1)
  • Page 31 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 26(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble M/B Step: 1. Disassemble M/B from the top case. (Fig.1) Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 32 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 27(1/1) Station : 2016/10/26 Name Disassemble USB/B Ver. : Date Step: 1. Disassemble USB/B. (Fig.1/ Fig.2) 14” Fig.1 15” Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 33 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 28(1/2) Station : 2016/10/26 Disassemble FAN Cable Name Ver. : Date Step: 1. Disconnect FAN cable form M/B CNTR. (Fig.1 / Fig.2) 14吋 14” Fig.1 15” 15吋...
  • Page 34 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 28(2/2) Station : 2016/10/26 Name Ver. : Date Disassemble Thermal Module & Fan Step: 1. Put the M/B on support fixture. (Fig.1) 2. Loosen thermal module set screw. ...
  • Page 35 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 29(1/1) Station : 2016/10/26 Name Ver. : Date Disassemble FFC & FPC For 14” Step: 1. Disassemble Smartcard/B FFC. (Fig.1) 2. Disassemble USB/B FPC.(Fig.2) For 15” 1.
  • Page 36 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 30(1/1) Station : 2016/10/26 Name Ver. : Date Package Step: 1. Put the M/B in box. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 37 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 31(1/1) Station : 2016/10/26 Name Ver. : Date Loosen Screws Step: 1. Loosen screw * 5. (Fig.1/Fig.2) 2. Separate top case and LCM module. (Fig.3) Fig.1 Fig.2 Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 38 Standard Operation Procedure Document No. Connery Travolta 14” & 15” FA DIS ASS’Y SOP 32(1/1) Station : 2016/10/26 Name Ver. : Date Package Step: 1. Put the top case in box. Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 39 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Connery/Travolta LCM DIS ASS‘Y Sub-assembly name: Connery/Travolta 14” & 15” LCM DIS ASS'Y SOP Document No.: Written by: Vick Weng Revision: Date: 2016/10/26 Page: A. Current station version list Station Ver. Station Ver. Station Ver.
  • Page 40 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 1(1/1) Station : Disassemble Bezel & Rear Cover 2016/10/26 Name Ver. : Date Step: Non-Touch SKU 1. Disassemble bezel in order.(Fig.1) Touch SKU 1. Disassemble bezel in order.(Fig.2) 2.
  • Page 41 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 2(1/1) Station : 2016/10/26 Name Disassemble Hinge Cap - L Ver. : Date Step: 1. Loosen hinge cap screw*1.(Fig.1) 2. Disassemble the left hinge cap from rear cover.
  • Page 42 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 3(1/1) Station : 2016/10/26 Name Disassemble Hinge BRKT - L Ver. : Date Step: 1. Rip the gasket. (Fig.1) 2. Loosen screw * 3. (Fig.2) 3. Disassemble the left hinge bracket from rear cover.
  • Page 43 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 4(1/1) Station : 2016/10/26 Name Disassemble Camera or MIC/B Ver. : Date Step: 1. Rip the AL foil that is on camera or MIC/B. (Fig.1) Fig.1 2. Rip the acid tape that is on LVDS cable. (Fig.2) 3.
  • Page 44 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 5(1/1) Station : 2016/10/26 Name Loosen Panel Screws Ver. : Date Step: 1. Loosen panel screw * 4. (Fig.1) Fig.1 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver (#1)
  • Page 45 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 6(1/1) Station : 2016/10/26 Name Disassemble Panel Ver. : Date Step: 1. Disassemble panel from rear cover. 2. Disconnect LVDS cable. (Fig.1 / Fig.2) Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 46 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 7(1/1) Station : 2016/10/26 Name Disassemble Hinge Cap - R Ver. : Date Step: 1. Loosen screw* 1. (Fig.1) 2. Disassemble the right hinge cap from rear cover.
  • Page 47 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 8(1/1) Station : 2016/10/26 Name Disassemble Hinge BRKT - R Ver. : Date Step: 1. Loosen hinge screw (6052B0096201) M2.5*2.5 * 3. (Fig.1) 2. Disassemble the right hinge bracket from rear cover.
  • Page 48 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 9(1/1) Station : 2016/10/26 Name Disassemble Antenna - R Ver. : Date Step: 1. Rip the acid tape & gasket. (Fig.1/ Fig.2/ Fig.3) 2. Disassemble antenna. (Fig.1/ Fig.2/ Fig.3) Fig.1 Fig.3 Fig.2...
  • Page 49 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 10(1/1) Station : 2016/10/26 Disassemble Antenna - Underside Name Ver. : Date Step: 1. Disassemble antenna from hooks. (Fig.1 / Fig.2 / Fig.3) Fig.1 Fig.2 Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 50 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 11(1/1) Station : 2016/10/26 Disassemble Antenna - L Name Ver. : Date Step: 1. Rip acid tape, and disassemble antenna from hooks. (Fig.1) Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...
  • Page 51 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 12(1/1) Station : Disassemble WLAN – R & L 2016/10/26 Name Ver. : Date Step: 1. Rip AL foil. 2. Disassemble WLAN antenna from rear cover. Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 52 Standard Operation Procedure Document No. Connery/Travolta 14” & 15” LCM DIS ASS’Y SOP 13(1/1) Station : Disassemble WWAN – R & L 2016/10/26 Name Ver. : Date Step: 1. Rip AL foil. 2. Disassemble WWAN antenna from rear cover. Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :...