Zte ZXSDR R8882 L708 User Manual page 17

Lte remote radio unit
Table of Contents

Advertisement

2.1.3 Safety Operation Guidance
Electrical Safety
1. Tool
When operating in the case of high voltage, use special tools. Do not use general
tools.
2. Power Cable
Cut off the power before installing or removing the power cable.
Before connecting the power cable, make sure the cable connection and labels
on the cable comply with the actual installation situation.
Do not install or remove the power cable when the power is ON.
Sparks or electric arc may happen when the power cable touches the conductor,
which may cause fire or eye injury.
3. Drilling
Unqualified drilling will damage the lines and cables in the cabinet. The metal
splashes may enter the cabinet and cause the short circuit on the circuit board.
When drilling on the cabinets is needed, wear insulating gloves and remove the
cables inside the cabinet before the operation. Take care of your eyes when
drilling, because metal splashes may hurt your eyes. Clean up the metal filings
once the drilling is done.
Do not drill on the cabinet at will.
4. Thunderstorm
During thunderstorm, strong electromagnetic field will be produced in the atmosphere.
Thus, to avoid lightning strike, take lightning grounding measures on the equipment
immediately.
During thunderstorm, do not perform operations of high voltage, and do not perform
operations on the iron tower or mast.
SJ-20110104194923-001|2011-1-15(R1.0)
Danger!
Warning!
Danger!
3-3
ZTE Proprietary and Confidential
Chapter 2 Product Installation

Advertisement

Table of Contents
loading

Table of Contents