Assembly And Preparation - aoyue Int 852A+ pro Instruction Manual

Smd rework station
Hide thumbs Also See for Int 852A+ pro:
Table of Contents

Advertisement

ASSEMBL Y and PREPARATIONS
As soon as the equipment has been removed from the package,
REMOVE THE SCREW located at the center of the bottom of the
main unit. This screw holds the pump in place during transportation.
WARNING:
Hot Air Gun holder was installed on the station upside down for
packaging purpose.
To set up the Hot Air Gun holder:
1. Loosen the two screws that secure the holder to the station.
2. Turn the holder right side up.
3. Re-fasten the two screws.
4. Place the hot air gun onto the holder in preparation for usage.
Turn
the
holder
right side up.
Failure to remove the screw before using the
equipment can cause damage to the system.
Re-fasten the two
screws.
Loosen the two screws
that secure the holder to
the station.
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Int 852A+ pro and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Int 852a++ pro

Table of Contents