Site Installation Tests - Ericsson RBS 2308 User Manual

Gsm system
Hide thumbs Also See for RBS 2308:
Table of Contents

Advertisement

RBS 2308 and RBS 2309 User's Guide
5.4.16
Testing the Installation
The RBS is now ready for the site installation tests.
The site installation tests should be performed directly after the completion of
the RBS installation, see Chapter Site Installation Tests.
After the installation and integration testing is completed, return to Section
5.4.17 on page 82.
5.4.17
Installing the Sunshields
This section describes how to install the sunshields.
Different sunshields are used depending on whether or not components are
installed on the front of the RRU.
1. If the fan unit or integral Omni Antenna are not used, install the top
2. If the fan unit is used, install the fan cover on top of the RRU. See Figure
82
sunshield and fasten two screws either to the RRU or the IXU. See Figure
below.
below.
EN/LZT 720 0027 Uen R8A 2006-06-27
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rbs 2309Rbs 2109

Table of Contents