RBS 2308 and RBS 2309 User's Guide
In case of spillage of hazardous substances, there should always be sufficient
absorbers or neutralizing materials available on site. There is a danger of
spillage occurring when installing, removing, replacing or servicing batteries.
The absorbers and neutralizing materials must be suitable for the hazardous
substances involved. Typical neutralizing agents are shown inTable 1 on
page 30.
Table 1
Typical Neutralizers
Baking soda (bicarbonate)
Sal soda
Soda ash
Note: Absorbers and neutralizing products will vary, depending on the country
3.4

Electrical Installation

This section provides information on ensuring that AC and DC powered
products are not damaged due to improper installation.
Stop! Do not install or modify AC or DC powered equipment unless you are a
qualified and authorized electrician. Improper installation work can seriously
damage the equipment.
3.4.1
Safety Precautions for Working with Electrical Installations
The following precautions must be observed when working with electrical
installations:
1. Ensure that approved circuit breakers or fuses are installed.
2. Ensure that the cables used have a sufficient cross-sectional area in
3. Ensure that conductors are connected according to the connection diagram.
4. Label the cables correctly.
5. Check the installation work upon completion.
30
Typical Neutralizers
and battery manufacturer. Consult the battery manufacturer for specific
details of absorbers and neutralizing materials.
accordance with product requirements and local laws and regulations.
Chemical Compound
NaHCO
3
Na
CO
IOH
O
2
3
2
Na
CO
2
3
Caution!
EN/LZT 720 0027 Uen R8A 2006-06-27