No.
Part name
Exchange of
5
2. Reactor
electric parts
1) Carry out works of 1 of
(Continued)
2) Remove the relay connector connected to
3) Remove each reactor.
4) Attach a new reactor.
Procedure
1
the control P .C. board.
(Truss B tight screw Ø4 × 6, 2 pcs. each)
and
.
3
- 71 -
FILE NO.SVM-18044-2
Remarks
Reactor relay connector
(Connected to lead wire
(White) at P.C. board side)
Screws