6.2 COMMISSIONING

a
Commissioning can only be performed after all test-
ing phases have been successfully completed.
a
Before commissioning the automation, ensure that
the owner is properly informed of all residual risks
and hazards.
a
The gate cannot be commissioned partially or un-
der "temporary" conditions.
To commission the automation:
compile the automation's technical file, which must in-
1.
clude the following documents: overall drawing of the
automation, wiring diagram, risk assessment and relative
solutions adopted, the manufacturer's declaration of con-
formity for all devices used and the declaration of con-
formity compiled by the installer
affix a permanent label or sign on the cubicle specifying
2.
the operations for unlocking the gate and manoeuvring it
manually "Figure 41"
41
affix a data plate to the cubicle specifying at least the
3.
following data: type of automation, name and address of
the manufacturer (responsible for commissioning), serial
number, year of manufacture and CE mark
compile the declaration of conformity of the automation
4.
and hand it to the owner of the automation
compile the User Manual of the automation and hand it to
5.
the owner of the automation
6.
compile and provide the owner with the automation's
"Maintenance schedule", containing the maintenance in-
structions for all the automation's devices.
l
For all the above-mentioned documentation, Nice –
through its technical assistance service – provides
the following: pre-completed forms.
20 – ENGLISH