Unpacking And Inspecting The Switch - Cisco Nexus 9348GC-FXP Hardware Installation Manual

Aci mode
Hide thumbs Also See for Nexus 9348GC-FXP:
Table of Contents

Advertisement

Unpacking and Inspecting the Switch

Unpacking and Inspecting the Switch

Before you install the switch, be sure to unpack and inspect the switch for damage or missing components.
If anything is missing or damaged, contact your customer service representative immediately.
Tip
Keep the shipping container in case the chassis requires shipping at a later time.
Before you begin
Before you unpack the switch and before you handle any switch components, be sure that you are wearing a
grounded electrostatic discharge (ESD) strap. To ground the strap, attach it directly to an earth ground or to
a grounded rack or grounded chassis (there must be a metal-to-metal connection to the earth ground).
Step 1
Compare the shipment to the equipment list provided by your customer service representative and verify that you have
received all items, including the following:
• Accessory Kit
• Rack-Mount Kit
Note
For the contents of these kits, see the
Step 2
Check for damage and report any discrepancies or damage to your customer service representative. Have the following
information ready:
• Invoice number of shipper (see packing slip)
• Model and serial number of the damaged unit
• Description of damage
• Effect of damage on the installation
Step 3
Check to be sure that each of the power supply and the fan tray modules have the expected direction of airflow as follows:
• Port-side intake airflow modules
• Burgundy (fan modules and AC power supplies)
• Port-side exhaust airflow modules
• Blue (fan modules and AC power supplies)
Note
All power supplies and fan modules must have the same direction of airflow.
Cisco Nexus 9348GC-FXP ACI Mode Hardware Installation Guide
14
Additional
Kits.
Installing the Switch Chassis

Advertisement

Table of Contents
loading

Table of Contents