Clearance Requirements - Cisco Nexus 9348GC-FXP Hardware Installation Manual

Aci mode
Hide thumbs Also See for Nexus 9348GC-FXP:
Table of Contents

Advertisement

Clearance Requirements

Warning
Statement 1048—Rack Stabilization
Stability hazard. The rack stabilizing mechanism must be in place, or the rack must be bolted to the floor
before you slide the unit out for servicing. Failure to stabilize the rack can cause the rack to tip over.
Clearance Requirements
Provide the chassis with adequate clearance between the chassis and any other rack, device, or structure so
that you can properly install the chassis. Provide the chassis with adequate clearance to route cables, provide
airflow, and maintain the switch. For the clearances required for an installation of this chassis in a four-post
rack, see the following figure.
1
2
3
4
Note
Both the front and rear of the chassis must be open to both aisles for airflow.
Cisco Nexus 9348GC-FXP ACI Mode Hardware Installation Guide
10
Chassis
Vertical rack-mount posts and rails
Chassis width
Width of the front clearance area (equal to the
width of the chassis with two rack-mount
brackets that are attached to it).
5
Depth of the chassis
6
Maximum extension of the bottom-support rails
7
Depth of the front clearance area (equal to the
depth of the chassis).
Preparing the Site

Advertisement

Table of Contents
loading

Table of Contents