Bottom   E Nd - Vortex MINI ROK Owner's Manual

Hide thumbs Also See for MINI ROK:
Table of Contents

Advertisement

                                                                   
VORTEX FACTORY: Via E. Fermi, 5 – 27040 Campospinoso (PV)– ITALY – Tel. +39 0385 765200
VORTEX FACTORY: Via E. Fermi, 5 – 27040 Campospinoso (PV)– ITALY – Tel. +39 0385 765200
 
5.14.   C onnecting   R od
Every   6 0   h ours   t he   r oller   c age   m ust   b e   c hanged.   D uring   t his   o peration   i s   g ood   u se   t o   c heck,   a nd  
eventually   r eplace   t he   c onnecting   r od,   t oo.
Due   t o   s pecial   t ools   r equired,   t his   o peration   m ust   b e   p erformed   b y   t he   V ortex   t echnicians   o r  
qualified   m echanics   o nly.  
 
 
5.15.   B ottom   E nd
 
Bearings   m ust   b e   c hecked,   a nd   e ventually   r eplaced,   a fter   6 0   h ours   o f   u se.  
Bearings   m ust   b e   a ssembled   o r   r eassembled,   w ith   n ame   a nd   t ype   f acing   e ach   o thers.    
Due   t o   s pecial   t ools   r equired,   t his   o peration   m ust   b e   p erformed   b y   t he   V ortex   t echnicians   o r  
qualified   m echanics   o nly.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Via   d ei   S oprini,   1 6   –   2 5080   P REVALLE   ( Brescia)   I TALY-­‐Tel.   + 39   0 30   6 804601   –   F ax   + 39   0 30   6 804698  
                           
 
 
OTK KART GROUP srl
 
 
torque.  
 
Important:   A fter   c hanging   t he   p iston,   t he  
engine   m ust   g o   t hrough   a nother   b reak-­‐in  
period.   S ee   " Starting   a nd   B reak-­‐in".  
 
 
 
Rev. 30/09/15

Advertisement

Table of Contents
loading

Table of Contents