Overview

4
Selecting and Integrating an IP00 System
The following steps will guide you in planning and installing a PowerFlex 755
IP00, NEMA/UL Open Type drive.
1. Considerations
Drive size (Hp & V AC), required accessories/options (HIM, comms, etc.)
Ingress protection of system
Mounting orientation of drive
Cooling method, venting orientation, alignment of venting
Control pod mounting location
Cabling entry/exit scheme and cable routing provisions
Roll-out cart required
Personnel safety and necessary tooling
2. Selection
Select and purchase enclosure with sub-panel and ingress accessories (page 16)
Select and purchase drive and corresponding drive options (see 750-TD001)
Select and purchase pod and corresponding cables (page
Select and purchase field termination kits (page
Select and purchase appropriate mounting kits (drive mounting & floor - page
or page 14)
Select and purchase door fans (pages 20...21)
Select and purchase necessary wire and cabling (pages
3. Prepare the Enclosure
Create ventilation openings, mount door fans (pages 17...21)
Provisions for accessories (HIM cradle, etc. - see 750-TD001)
Fabricate and mount inlet and outlet plenums (pages 17...19)
Drill sub-panel(s) (page
Mount field termination kit, mounting brackets, and floor kit (page
Mounting of customer specified accessories
Remote mounting of control pod (if specified - see 750-IN015)
Mount sub-panel(s)
4. Power and Ground Wiring
Ensure proper grounding (page 45)
Position & secure movable L-brackets (page 49)
Properly terminate power cables (page 48)
Attach power cabling (page 48)
5. Roll-in and Secure the Drive Unit
Raise drive unit to vertical orientation (page 37)
Position roll-out cart (see 750-IN001)
Lift drive unit onto cart (see 750-IN001)
Roll drive unit into cabinet and secure (see 750-IN001)
6. Control Wiring
Mount control pod into drive (if specified - page 42)
Verify control transformer voltage (page 41)
Ensure proper cable routing (page 58)
Attach pod power and fiber optic cables (page 58)
Install real time clock battery and HIM cable (page 60)
Install remaining control wiring (pages 59...66)
Verify correct torque on all fasteners and connectors
7. Commission the System
Rockwell Automation Publication 750-IN020D-EN-P - May 2017