Installing the SMC EZ Switch 1000
Equipment Checklist
After unpacking the EZ Switch 1000, check the contents of the box
to be sure you have received the following components:
Check the contents of your package for following parts:
6 port 10/100/1000 Copper Gigabit Switch
Power cord
19" rack mount brackets.
RS232 cable
SMC Warranty Registration Card
This User Guide
Selecting a Site
Be sure to follow the site selection guidelines below when choosing a
location:
Select a suitable location for the switch:
1. It should be accessible for installing, cabling and
maintaining the switch.
2. The temperature and humidity should be within the
ranges listed in the specifications.
3. The status LEDs should be clearly visible.
4. There should be adequate space (approximately two
inches) on all sides for proper air flow.
Make sure twisted-pair cable is always routed away from power
lines, fluorescent
Chapter 2
Need help?
Do you have a question about the SMC8506T and is the answer not in the manual?
Questions and answers