Husqvarna P 524 Operator's Manual page 30

Hide thumbs Also See for P 524:
Table of Contents

Advertisement

Available languages

Available languages

9. Remove the belt guard below the engine pulley.
10. Remove the belt guard in front of the rear
transmission.
11. Remove the belt from the engine pulley.
12. Remove the belt guard on the right side of the
machine.
30
13. Pull the front part of the belt out through the right
side of the articulation of the product.
14. Remove the belt from the hook on the center pulley.
15. Pull the drive belt out.
16. Attach a new drive belt in the opposite sequence.
Make sure that the drive belt for the cutting deck is
attached as the illustration shows. Make sure that it is
put correctly in the adjuster pulley, identified by an arrow
in the illustration.
To put the cutting deck in servicing
position
To remove the cutting deck on
1. See steps 1–8 in
page 15 .
242 - 003 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 524efi

Table of Contents