Switching On The Heating System; Testing System Components; Setting The Primary Air Guide And The Grate Height For The Respective Fuel - HDG Euro 30 Operation Manual

Table of Contents

Advertisement

5 Commissioning the system – Procedure
P
ROCEDURE
42
S
WITCHING ON THE HEATING SYSTEM
1.
Switch on the circuit breaker for the mains electricity supply, or
otherwise ensure the unit is provided with power.
2.
Turn on the emergency heating switch (if one has been installed).
The heating system is now under voltage.
The indicator lamp in the emergency heating switch will light up.
The control is activated.
See the "HDG Control" operating manual, chapter
"Commissioning the system".
T
ESTING SYSTEM COMPONENTS
Important!
For safety reasons, the system component test may only be
conducted when there is no fuel in the boiler and there are no
remaining embers.
The system component test can only be conducted in the "Ready"
state.
See the "HDG Control" operating manual.
Depending on the hydraulic system selected, the system
component test must be performed for additional components.
S
ETTING THE PRIMARY AIR GUIDE AND THE GRATE HEIGHT FOR THE
RESPECTIVE FUEL
An optimum gasifying of the fuel and thus an efficient combustion
can only be achieved if the boiler is preset for the fuel to be used and
its burning properties. Adapting to the on-site conditions is also of
critical importance.
A switching of the basic fuel type, e.g. from softwood to hardwood,
requires a resetting of the boiler to the changed requirements of
the fuel!

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Euro 40Euro 45Euro 50

Table of Contents