Pro-Shift Pitch Control Cable Replacement - WACKER Group CT 30 Series Repair Manual

Walk-behind trowels
Table of Contents

Advertisement

2
GUIDE HANDLE
®
2.6
Pro-Shift
Pitch Control Cable Replacement
Disassembly:
®
1. Push Pro-Shift
handle
move two M6 screws
Shift
®
assembly.
2. Remove two retaining nuts
(q)
cable
.
3. Disengage cable from fork
(p)
pulley
.
WARNING
Due to tension in torsional spring, the Pro-Shift
handle may snap back abruptly and strike
personnel working in the vicinity.
®
4. Pull the Pro-Shift
handle all the way back.
5. Remove two M8 screws
(o)
base
. Carefully pull handle and cable control away
from handle base.
(k)
6. Remove M6 screw
assembly and pitch control cable from handle.
7. Remove threaded rod
Note: On some models the threaded rod may be
replaced by a bolt.
(g)
8. Remove M8 screws
(f)
and mandrel
.
9. Using pliers, squeeze handle legs
remove handle.
10. Slide dowel pin (b) to one side.
Note: On some models, the dowel pin may have a
(c)
retaining washer
.
11. Slide control cable off of dowel pin.
2-8
(a)
all the way forward. Re-
(d)
(e)
and cover
from Pro-
(s)
from the pitch control
(r)
and slide through
®
(n)
holding handle to handle
from handle. Pull Pro-Shift
(h)
(j)
from housing
.
. Pry out torsional spring
(a)
together and
k
®
s
(m)
TROWEL REPAIR
m
e
f
g
h
j
1001RM04
o n
n
p
q
r
a
b
c
d
1013SD53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents