Installation And Commissioning; Installation - ABB AW101 Instruction Manual

Testomat water hardness analyzer
Table of Contents

Advertisement

Water Hardness Analyzer
AW101 Testomat

2 Installation and Commissioning

2.1 Installation

Fig. 2.1 Dimensions
Note. The unit doors swing to the left when opened. Allow
sufficient space for the doors to open when preparing for
installation.
1. Fix the unit vertically to the wall and secure using suitable
fixings.
2. Avoid tension of the housing.
IM/AW101
Rev. C
380 (14.96)
266 (10.47) Fixing Centers
2 Installation and Commissioning
280 (11.02)
3