Tube Installation; Coupling And Tube Assembly - Roberts Gorden Corayvac CRV-B Series Installation, Operation & Service Manual

Custom-engineered, low-intensity infrared heating systems
Table of Contents

Advertisement

Step 7.1 Tube Installation
Distance of first
hanger after burner
Description
Tube
Turnbuckle
Tube/Reflector Hanger
Step 7.2 Coupling and Tube Assembly
A
Close coupling and slide
opposite end into tab.
Position tab underneath
guide rail.
C
Insert tubes into coupling
until end of each tube rests
against internal pins.
Note: CORAYVAC® Classic systems require
all hangers after the first hanger to be
positioned a maximum of 7' (2.1 m) apart.
Part Number
91409XXX
91903201
0309010X
B
Insert wide end of slide bar/coupling lock into
guide rail on opposite end of tabs. Slide the slide
bar/coupling lock up the guide rail until snug
(approximately 3" (8 cm) to 4" (10 cm)).
D
Strike slide bar/coupling lock with mallet or hammer
until tight.
Description
Part Number
Coupling
Slide Bar/Coupling Lock
Tube
91409XXX
SECTION 7: H
I
EATER
NSTALLATION
01329600
01329700
23 of 85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents