Roberts Gorden Corayvac CRV-B Series Installation, Operation & Service Manual page 7

Custom-engineered, low-intensity infrared heating systems
Table of Contents

Advertisement

TABLE OF FIGURES
Figure 1: Side Panel Label Placement...................................... 2
Figure 3: Level Reflector ........................................................... 6
Figure 4: One Side Reflector..................................................... 6
Figure 5: Two Side Reflectors ................................................... 6
Figure 9: 2-Foot Deco Grille...................................................... 8
Figure 10: Barrier Shield ........................................................... 8
Figure 11: Protective Grille ........................................................ 8
10
(Continued) ............................................................ 11
High Efficiency Reflector ........................................ 11
Reflector................................................................. 12
Reflector (Continued)............................................. 13
Figure 17: Optional Heater Accessories.................................. 14
Figure 18: Pumps and Controls Descriptions .......................... 15
Figure 19: Heater Assembly Overview ................................... 19
Figure 20: Critical Hanger Placement ..................................... 21
Figure 21: Critical Hanger Placement (CORAYVAC® Classic)22
Figure 23: Reflector Joint Detail .............................................. 32
Figure 26: Condensate Neutralization Tube ............................ 41
Figure 27: Vertical Venting Configuration ................................ 43
44
Figure 30: Duct Sizing ............................................................ 47
Figure 32: Filter Housing Assembly ........................................ 48
Figure 33: Air Supply Blower Support ..................................... 48
Figure 34: Pressurized Outside Air Supply.............................. 49
54
Control Panel (optional) ......................................... 55
56
Figure 40: General System Wiring .......................................... 57
Ø Pump ................................................................. 57
230 V 1 Ø Pump (optional) .................................... 58
V (or 460 V) 3 Ø Pump (optional) .......................... 59
®
Modulating Wiring Diagram [LonWorks
(2-10 Vdc with 500 ohm resistor) optional] ............ 60
®
Modulating Wiring Diagram [LonWorks
(4-20 mA) optional] ................................................ 61
Figure 46: Burner Internal Wiring............................................ 62
Figure 47: Burner Internal Ladder Diagram ............................ 62
Figure 48: Vacuum Reading ................................................... 65
®
®

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents