5- Installation Of The Reefing Line; 6- Adjusting The Furling Line Guide; 7- Fitting The Pre-Feeder (Lx/Rx Ranges) - Facnor LS Installation Manual

Reefing & furling systems
Table of Contents

Advertisement

Available languages

Available languages

English

5- INSTALLATION OF THE REEFING LINE

Y
6- ADJUSTING THE FURLING LINE GUIDE (LS RANGE)
Z

7- FITTING THE PRE-FEEDER (LX/RX RANGES)

For the LX/RX ranges, we supply one pre-feeder that helps to guide the sail while hoisting.
7.1
7.1- Wind the « vectran » loop twice round the telescopic section.
7.2- Pass the pre-feeder through the loop as shown.
7.3- Position the pre-feeder at the suitable height and pull tight. Once the sail is fitted, loosen
the loop and remove the pre-feeder. Store for future use.
Facnor - LS / LX / RS / RX reefing and furling systems - Installation manual
28
5.1 Positioning the front deck block
The furling line should be installed as shown.
The furling line should run off at 90° to the forestay and
through the stainless steel guide (fig. X).
(If the line does not run within the guide, please see
X
paragraph 6.1 below)
Fit the front deck as far as possible from the drum. The
furling line should run at 90° to the foil sections with the
line situated at mid-height round the drum as shown.
5.2 Setting the reefing line up
IMPORTANT: First half hitch the furling line (fig. Y)
around the body of the drum. Then, feed the line
through the hole in the top plate and tie a figure eight
knot as shown.
WHEN THE SAIL IS FURLED UP, THERE SHOULD BE
ALWAYS A FEW TURNS REMAINING AROUND THE
DRUM
6.1 Slightly loosen the screw (fig. Z) so that the guide
can rotate.
BEWARE: DO NOT REMOVE THE SCREW.
6.2 Orientate the guide by pulling the furling line up.
NOTE: For RX/LX ranges, adjust the furling line guide when
tightening the two lower screws of the drum (see Rep C' on
page 14)
7.2
.
FURL A FEW EXTRA TURNS AROUND THE DRUM.
.
7.3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

LxRx

Table of Contents