Nova Ventus Manual page 28

Table of Contents

Advertisement

Available languages

Available languages

_54
Attaching the deployment handle
8
Now the two ends of the deployment handle can be stowed in the pockets next
to the eyelets. Using the two round windows it is possible to check whether the
yellow rods are in the correct position.
Deployment check
9
After fitting the parachute, it is essential to perform a deployment check. Hang
the harness by its carabiners, sit in it and pull the deployment handle. In the flying
position, deployment should be easy and conform to the manufacturer's specification.
The required force must not exceed seven (7) daN.
At this point you should also check that the speed-bar and/or stirrup do not impede
the parachute deployment.
Comments
• Before every flight, check the parachute container is closed correctly. Check that
the yellow rods are threaded through the loops.
• Know the location of your deployment handle. In calm conditions, practise putting
your hand on the deployment handle (obviously without pulling it!) and mentally
rehearse a deployment.
_55
_EN

Advertisement

Chapters

Table of Contents
loading

Table of Contents