Cisco Performance Routing Engine 5 Hardware Installation Manual page 14

Hide thumbs Also See for Performance Routing Engine 5:
Table of Contents

Advertisement

Figure 8: Positioning the PRE5 in the Chassis Slot
Step 3
Use your hand to hold the ejector levers and exert a little force in the up and down direction to keep the ejector levers at
the fully-open position. Then carefully align the upper and lower edges of the PRE with the upper and lower guides in
the slot.
14

Advertisement

Table of Contents
loading

Table of Contents