Download Print this page

Advertisement

Quick Links

Preparing for Installation

Safety Recommendations and Warnings

Please read the following safety guidelines before you install this product:
• Review the safety warnings listed in Regulatory Compliance and Safety Information for the Cisco 5400
• Keep the chassis area clean and dust-free during and after installation.
• Keep the chassis in a safe place when you remove the chassis cover.
• Do not wear loose clothing that could get caught in the chassis.
• Wear safety glasses when working under conditions that might be hazardous to your eyes.
• Do not perform any action that creates a hazard to people or makes the equipment unsafe.

Safety with Electricity

Follow these general guidelines when working on equipment that is powered by electricity:
• Locate the emergency power-off switch in the room in which you are working. If an electrical accident
• Disconnect all power before doing the following:
Enterprise Network Compute System before installing, configuring, or maintaining the device.
occurs, you can quickly turn off the power.
• Installing or removing a chassis.
• Working near power supplies.
Preparing for Installation
1

Advertisement

loading

Summary of Contents for Cisco 5400

  • Page 1: Table Of Contents

    Safety Recommendations and Warnings Please read the following safety guidelines before you install this product: • Review the safety warnings listed in Regulatory Compliance and Safety Information for the Cisco 5400 Enterprise Network Compute System before installing, configuring, or maintaining the device.
  • Page 2: Site Requirements

    Preparing for Installation Site Requirements • Look carefully for possible hazards in your work area, such as moist floors, ungrounded power extension cables, frayed power cords, and missing safety grounds. • Do not work alone if hazardous conditions exist. • Never assume that power is disconnected from a circuit. Always check. •...
  • Page 3 Preparing for Installation Site Requirements • Ensure that the chassis cover and module rear panels are secure. All empty network module slots, interface card slots, and power supply bays must have filler panels installed. The chassis is designed to allow cooling air to flow within it, through specially designed cooling slots.
  • Page 4: Mounting Requirements

    To place the system in a proper location, it is necessary to know the dimensions of the device's chassis. The Cisco 5400 ENCS can be placed on a desktop or installed in a rack. The mounting ears for the device are designed for #12-24 UNC screws.
  • Page 5: Network Cabling Specification

    Preparing for Installation Network Cabling Specification Network Cabling Specification • Ethernet cables for RJ45 ports • Serial or console cables used to connect devices like routers • Shielded USB cables with properly terminated shields for the USB port • Standard Shielded Cable with 15-Pin VGA Male Connector Required Tools and Equipment You will need the following equipment to install the device and its equipment: •...
  • Page 6 Preparing for Installation Required Tools and Equipment Preparing for Installation...