Disassembly and assembly

Introduction

Disassembly and assembly
Introduction
Further work
Further tasks, which are not described here, may be carried out only by
trained personnel from an ABB Turbocharging service station.
Only carry out those tasks that are described in this chapter.
Marking casing positions for assembly
ABB Turbo Systems recommends that the casing positions are marked
before disassembling the turbocharger.
Identifying assembly devices
Not all assembly devices are marked with a part number. They can be
identified using the tool list. This list is enclosed in the toolbox.
Maintaining assembly devices
Assembly devices must be checked for damage before and after use.
Visually check for corrosion, cracks, deformation and wear.
Don't use damaged assembly devices, but replace them.
Customer spare parts set
Before beginning work, ensure that the required customer spare parts
sets are available.
See chapter Spare parts.