Installing The Turbocharger - ABB TPL65-A32 Operation Manual

Hide thumbs Also See for TPL65-A32:
Table of Contents

Advertisement

7.3
7.3
NOTICE
© Copyright 2014 ABB. All rights reserved.
Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Removal and installation

Installing the turbocharger

Installing the turbocharger
Remove cover from oil connection.
Inspect lifting gear.
Fasten separate lifting gear to each of two bearing casing ribs
provided for this purpose.
Oil orifice plate
An orifice plate is fitted in each of the two oil inlet channels in the
bearing casing. In order to obtain the required oil pressure, the diameter
of this orifice plate was individually adjusted by the engine builder.
Whenever these orifice plates are removed, or if the bearing casing, the
cartridge group or the complete turbocharger is replaced, make
absolutely sure that the orifice plate with the correct diameter is fitted in
the oil inlet channel in which the oil flows.
Re-use existing orifice plate.
Adapt turbocharger to suit engine.
Tighten fixing screws in foot in accordance with engine builder's
instructions.
Fasten gas, air and oil lines in accordance with engine builder's
instructions.
TPL65: Version with compressor wheel cooling system
Fit air supply line. (See also chapter Preliminary remarks / Layout and
functioning.)
Refit removed parts of insulation.
Plug in cable connector on speed sensor.
7
7.3
Page 76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents