ABB TPL65-A32 Operation Manual page 59

Hide thumbs Also See for TPL65-A32:
Table of Contents

Advertisement

5.3.2
NOTICE
Operating the water
pressure vessel
© Copyright 2014 ABB. All rights reserved.
Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Maintenance
Cleaning the compressor during
operation
Wet cleaning using external water-pressure vessel (XC3)
Operating state prerequisites for compressor cleaning with XC3
To be able to carry out a satisfactory cleaning process that has been
tested and is recommended by ABB Turbo Systems, the following
prerequisites must be fulfilled:
Engine load 50 ... 85%
Start cleaning cycle according to following description Wet cleaning
operation with XC3.
Compressor wet cleaning procedure with XC3
It is mandatory to fulfil the operating condition prerequisites before
cleaning compressors with XC3.
Remove the sealing plug (X).
Fill the vessel with the required volume of clean water (see the Table
of cleaning parameters).
Screw in the sealing plug (X).
Push the valve activator (Y) against the spring and hold it for 10 to 15
seconds until the entire volume of water has been injected.
5
5.3
Page 57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents